
Not just a parts supplier, KPF understands the entire process of the project, makes the products best suited for the characteristics of each project, and expands the scope of our responsibility as a reliable partner.
-

London Olympic Stadium
The Olympic Stadium is the main structure of the 2012 Olympics to be held in London. Construction work began in 2008.
KPF is supplying the T/C bolts for fastening and supporting the structures of the project, and we are doing what we can to make the Olympics, a global festival, a great success. -

Worldcup Stadium, Cape Town South Africa
Construction of the Cape Town stadium for the 2010 World Cup was completed in 2009 after demolition of the old stadium in 2007. KPF supplied the T/C bolts for the entire project.
-

Doha Airport, Qatar
Qatar is in the process of building a new airport in Doha as capacity of the old airport has reached its limit. Completion is scheduled for 2012.
KPF is supplying all the T/C bolts for the New Doha International Airport project. -

Incheon Bridge
The Incheon Bridge is a 12.3km-long 6-lane bridge connecting the Incheon International Airport with the Incheon Songdo international city.
KPF supplied T/C bolts for the bridge, thereby contributing to improving the efficiency of the construction work. -

Cheongdam Bridge
The Cheongdam Bridge is a 6-lane span connecting the Gangbyeon Expressway with the urban expressway. The upper deck has a road for automobiles while the lower deck has tracks for a subway. KPF supplied the torque shearing bolts which possess superior constructability and quality compared with welded joints.
-

Seongsu Bridge
The original bridge was demolished after its tragic collapse in 1994, and the New Seongsu Bridge was reborn as a high tech design built to the highest possible standards of safety and strength. With its quality-oriented system and quality assurance products, KPF was chosen as a new fastener supplier for the New Suongsu Bridge Project and successfully supplied its T/C Bolts to the reconstruction of the Bridge, which made KPF stand higher in the technical position in the market.
-

Gwangan Bridge
The Gwangan Bridge is anchored off Gwangan-ri beach in Busan. It connects Haeundae-gu to Suyeong-gu.
The total span is 7.4 Km long (the suspension bridge is 900m), and the width is 25m. KPF supplied the T/C bolts for the entire structure. -

Seohae Bridge
The Seohae Bridge is a 7.3km-long bridge spanning the part of the West Coast Expressway which runs above the West Sea. It is the second longest bridge in Korea.
KPF supplied T/C bolts for the construction of the Seohae Bridge. -

Petrochemistry plant, Indonesia
KPF supplied piping bolts and T/C bolts for the Petrochemical plant project.










